Orbit renders procurement services to her vast clientele. Over time, we have      worked with OEM’s to deliver quality and reliable tools and equipment. Orbit has expertise in sourcing, negotiating terms, purchasing items, receiving and inspecting goods as necessary and keeping records of all the steps in the process of procurement and product delivery.

 

Materials procurement has many phases like:

  1. Ordering goods well in advance specifying dates of receipts
  2. Procuring materials for direct usage which deals with checks on statistical data of physical stocks, consumption, daily, weekly or monthly requirements and placing orders
  3. Dispatch and transportation planning execution

There are some of the aspects which have to lie iii-minute details.

  1. The project manager will liaise with the i-lead 0111cc for funds and materials required from abroad and company offices, stores, warehouse and workshop.
  2. Thesiteagentwillliaisewithprojectmanagerfordirectpurchaseofmaterials
  3. The site manager will liaise with site agent on production, requirements, arrangements, transportation and storage

Water

  • –  Chemical analysis
  • –  Usability in concrete works Similarly, on equipment spares fuel, consumables etc. the plant manager, stores head will play a similar role, all interacting with each other. A regular meeting will also be convened with all heads for achieving the common goal of work.

    The company proudly boasts of having a unique coordinator among its staff to achieve a smooth flow of progress of work, –

    Storage

    the storage of materials has a great deal of connection viz-a-viz material procurement, because storing goods and materials are not handled in an efficient and orderly mariner confusion would arise thereby putting procurement and requirements in disarray. Similarly, if materials are not stored correctly safety of personnel, life and goods would be impaired. This will have a very serious repercussion on a project. Different goods have different storage requirements and techniques and its virtually difficult to deal with all items here. Some of the safety requirements on storage are dealt with, separately

    generally, for projects, some important items require highlights are listed: –

  1. cementshallbedeliveredinquantitiessufficienttopreventanydisruptionof the work, but not large to cause excessive storage time on site. The supervisor shall regularly verify that each consignment is kept separate from others and used in the same order as delivered to site. the supervisor will also make sure that cement packing is kept intact until use, and that the storage place remain dry
  2. aggregates shall be delivered to site in separate sizes, according to the specified aggregates range of sizes. The supervisor will also make sure that different sizes are kept in separate bins, and shall proceed to random verifications of seize aspect.
  3. All tools, tackles spares and minor consumables will be stored in racks rind bins in the warehouse.
  4. Waterandfuelwillbestoredinthetanksandkeptinshadewithwarningsigns such as no-smoking inflammables materials etc, for fuel
  5. Oil and lubricants will be stored in drums and stacked in a neat order displaying warning sign similar to fuels.